POV staff
latest

Table of Contents

  • Build Guide
    • Tools and materials
    • Kit of parts
    • Build overview
    • Step 1: Dowels
    • Step 2: LED assemblies
    • Step 3: Charge connector
    • Step 4: Switch connector
    • Step 5: Finishing LED assemblies
    • Step 6: Batteries
    • Step 7: Controller assembly
    • Step 8: Testing
    • Step 9: Battery and controller assembly
    • Step 10: Final assembly
  • User Guide
  • License and Acknowledgments
POV staff
  • Build Guide
  • Edit on GitHub

Build Guide

Please follow the steps below to build your staff.

Table of Contents

  • Tools and materials
  • Kit of parts
  • Build overview
  • Step 1: Dowels
  • Step 2: LED assemblies
  • Step 3: Charge connector
  • Step 4: Switch connector
  • Step 5: Finishing LED assemblies
  • Step 6: Batteries
  • Step 7: Controller assembly
  • Step 8: Testing
  • Step 9: Battery and controller assembly
  • Step 10: Final assembly
Previous Next

© Copyright 2023, Alexander Kirillov. Revision 83ab6f1a.

Built with Sphinx using a theme provided by Read the Docs.